Shaping Community Mobility Solutions Across Liberty County

Please visit our other web pages under the HAMPO tab for information on what we are doing and how we are doing it.

As a result of the 2000 Census, the Hinesville Area Metropolitan Planning Organization (HAMPO) was established to address transportation planning within the urbanized portions of Liberty and Long Counties, including Fort Stewart, and the municipalities of Hinesville, Allenhurst, Flemington, Gum Branch, Midway, Riceboro, and Walthourville.  HAMPO is staffed by the Liberty Consolidated Planning Commission and operates under the leadership of a Policy Committee comprised of elected officials and other decision-makers from each participating jurisdiction, the Georgia Department of Transportation, and other state and federal agencies.  A Technical Coordinating Committee and Citizens Advisory Committee provide valuable input to the Policy Committee on transportation issues.

The mission of the Hinesville Area Metropolitan Planning Organization is ”to provide the citizens of the HAMPO study area, the traveling public, and the military with a safe, efficient, environmentally sound, and cost-effective multimodal transportation system that operates at reasonable levels of service, supports and enhances our economy, promotes our comprehensive development goals, and complements the mission of Fort Stewart.”

Certification: In accordance with the federal requirements of 23CFR 450.334, “all Metropolitan Planning Areas … the MPO shall certify at least every four (4) years that the metropolitan transportation planning process is being carried out in accordance with all applicable requirements…”  On September 29, 2021, a meeting was held with GDOT and FHWA, and it was determined that HAMPO has achieved a four-year certification as shown on page 13 of the report. The report itself documents compliance with the federal requirements:

For additional information, contact Jeff  Ricketson.

All publications herein were prepared in cooperation with the Department of Transportation, Federal Highway Administration. The opinions, findings, and conclusions in these publications are those of the author(s) and not necessarily those of the Department of Transportation, State of Georgia, or the Federal Highway Administration.

HAMPO Organization

HAMPO is operated under the leadership of a Policy Committee, comprised of elected officials and other decision-makers from each participating jurisdiction, the Georgia Department of Transportation, and other state and federal agencies.  A Technical Coordinating Committee and Citizens Advisory Committee provide valuable input to the Policy Committee on transportation issues.

Use the links below to review the governing documents that create the framework for the HAMPO committees as well as the federal, state, and local laws that govern the planning process.
HAMPO Participation Plan Amendment 3 (Amended 2022-05-26)(opens in new tab)
Title VI Non-Discrimination Plan (approved 2017-02-09)(opens in new tab)
Title VI Complaint Resolution Procedure (v2015-06-22)(opens in new tab)
Formulario de Quejas de Discriminación Título VI (v2015-06-22)(opens in new tab)
HAMPO Committee (PC TCC CAC) Bylaws (Amended 2021-02-11)(opens in new tab)

For additional information, contact Kelly Wiggins(opens in new tab).

Use the links below to learn more about our federal and state agencies:

Federal Highway Administration—fhwa.dot.gov(opens in new tab)
Federal Transit Administration—fta.dot.gov(opens in new tab)
Georgia Department of Transportation—dot.ga.gov(opens in new tab)

All publications herein were prepared in cooperation with the Department of Transportation, Federal Highway Administration. The opinions, findings, and conclusions in these publications are those of the author(s) and not necessarily those of the Department of Transportation, State of Georgia, or the Federal Highway Administration.

HAMPO Plans and Documents

Please email Jeff Ricketson, Executive Director, at jricketson@thelcpc.org with any questions or comments.

***PUBLIC NOTICE***

The Draft HAMPO FY 2027–2030 Transportation Improvement Program was out for a 15-day public comment period. The public comment period is from June 12 to June 27, 2026.

Please contact Jeff Ricketson at (912) 408-2030 or jricketson@thelcpc.org with questions or comments. The draft TIP can be viewed below.

PLANNING DOCUMENTS

HAMPO develops and maintains three planning documents in accordance with the continuous, cooperative, and comprehensive planning process detailed in the Fixing America’s Surface Transportation (FAST) Act, Public Law No. 114-94. The Metropolitan Transportation Plan, the Transportation Improvement Program, and the Unified Planning Work Program are the transportation planning HAMPO documents needed to meet federal and state standards for Metropolitan Planning Organizations.

HAMPO’s Metropolitan Planning Area defines the area we are responsible for:

Unified Planning Work Program

The purpose of the Unified Planning Work Program (UPWP) is to describe the planning priorities of the metropolitan planning area and all planning activities anticipated during the next one-year period, including expected costs for such activities. The UPWP is updated annually and aligns with the State’s fiscal year, beginning July 1 and ending June 30.

The FY 2027 UPWP was approved and adopted by the HAMPO Policy Committee on April 9, 2026. The Federal Highway Administration approved the HAMPO UPWP on June 18, 2026. The final, approved document can be viewed below:

An administrative modification was performed on the FY 2027 UPWP on July 14, 2026, to update task line costs for several work program tasks. The updated UPWP document can be viewed below:

An administrative modification was performed on the FY 2026 UPWP on July 27, 2026, to rebalance funds by task and phase level. The updated totals can be seen in the PL and 5303 budget table on page 67.

Previous Year UPWPs

Metropolitan Transportation Plan

The goal of the MTP is to create an effective public policy framework for mobility and development together with a set of priority transportation investments that will address the area’s current and long-term needs. The projects that are selected as priorities for the transportation network will be programmed into the Statewide TIP for funding.  The plan must comply with federal guidelines as outlined in the FAST Act and previously MAP-21 and is updated every 5 years.

The 2050 Metropolitan Transportation Plan (MTP) has been approved by the HAMPO Policy Committee on August 14, 2025. The full report document, including the report appendices, can be viewed below:

Previous MTPs

The 2045 HAMPO MTP was adopted by the HAMPO PC on September 10, 2020. That report, along with the amendments developed for the 2045 MTP and the 2040 MTP, can be viewed by clicking on the links below:

The Hinesville Area Metropolitan Planning Non-Motorized Plan and Transit Operations Plan update is a supplement to the 2040 MTP:

The Hinesville Area Metropolitan Planning Regional Freight Plan update is a supplement to the 2040 MTP:

Transportation Improvement Program

The Transportation Improvement Program provides a fiscally constrained program of highway and road projects for the Hinesville Metropolitan Planning Area for the next four years. The HAMPO FY 2024-2027 TIP was approved by the HAMPO Policy Committee on August 10, 2023. The TIP can be viewed below:

Amendment #7: An amendment was made to the FY 2024–2027 TIP at the request of the GDOT Office of Planning. This amendment adds a new project to the TIP, PI 0021704 (Deal St. Roundabout project), and removes PI 0021247 (Link Street; Norman Street & Tupelo Trail at 3 locations) from the TIP. This amendment was approved by the HAMPO Policy Committee on June 11, 2026, and can be viewed below:

Administrative Modification #17: An administrative modification was performed on April 7, 2026, at the request of the GDOT Office of Planning to update the construction phase costs for several projects. The modified TIP can be viewed below:

Administrative Modification #15: An administrative modification was performed on February 13, 2026, at the request of the GDOT Office of Planning to add the scoping phase to the Hinesville Bypass Phase II project. The modified TIP can be viewed below:

Previous FY 2024–2027 TIP Administrative Modifications can be viewed below:

The HAMPO FY 2024–2027 TIP was recommended for an amendment by the GDOT Office of Planning. This amendment updates the project cost for the PE phase of PI 0020353 (EV CHARGING STATION @ 1 LOC IN LIBERTY/MCINTOSH COUNTY), updates the FY 2025 budgets for several projects in the detailed cost summary and cost detail tables, adds a new discretionary grant matrix, calendar year 2025 PM1 performance measures, and new administrative modifications and amendments requirements. The amended TIP was open for a 15-day public comment period from December 12, 2024, to December 27, 2024. The amended TIP was approved by the HAMPO Policy Committee on February 13, 2025.

Amendment #5 and Administrative Modification #6 can be viewed in the TIP document below:

Previous FY 2024–2027 TIP Amendments can be viewed below:

The GDOT State Transportation Improvement Program (STIP) can be found at the link below:

Previous FY 2018-21 TIPs (H3)

Federal law requires that metropolitan planning organizations publish an annual list of obligated projects.

§ 450.334 Annual listing of obligated projects(opens in new tab).

(a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the end of the program year, the State(opens in new tab), public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C.(opens in new tab) or 49 U.S.C. Chapter 53(opens in new tab) were obligated in the preceding program year.

(b) The listing shall be prepared in accordance with § 450.314((opens in new tab)a) and shall include all federally funded projects authorized or revised to increase obligations in the preceding program year and shall, at a minimum, include the TIP information under § 450.326(g)(1) and ((opens in new tab)4) and identify, for each project, the amount of federal funds requested in the TIP, the federal funding that was obligated during the preceding year, and the federal funding remaining and available for subsequent years.

(c) The listing shall be published or otherwise made available in accordance with the MPO’s public participation criteria for the TIP.

The FY 2025 HAMPO Obligated Projects & Authorization Letter are listed below:

Previous Obligated Project Lists

Certification: In accordance with the federal requirements of 23CFR 450.334, “all Metropolitan Planning Areas … the MPO shall certify at least every four (4) years that the metropolitan transportation planning process is being carried out in accordance with all applicable requirements…”  In 2021, HAMPO achieved a four-year certification as shown on the last page of the report. The report itself documents compliance with the federal requirements:

Transportation Studies

On April 10, 2025, the HAMPO Policy Committee adopted the SS4A-funded Safety Action Plan. This plan was developed with the intent of creating implementation strategies to prevent roadway deaths and serious injuries. Upon completion and adoption of a Safety Action Plan, the prioritized list of projects will be eligible for funding from a variety of sources, including Implementation Grants through the Safe Streets for All (SS4A) grant program from the 2021 Bipartisan Infrastructure Law. The adopted plan, along with the signed resolution and related appendices, can be found below.

For additional information, contact Jeff Ricketson.

All publications herein were prepared in cooperation with the Department of Transportation, Federal Highway Administration. The opinions, findings, and conclusions in these publications are those of the author(s) and not necessarily those of the Department of Transportation, State of Georgia, or the Federal Highway Administration.

Focus on Transit

TRANSIT PLANNING ( H3)

Transit planning is funded per an annual Section 5303 planning assistance grant to provide for effective, affordable, and accessible public transportation options and alternatives in the Metropolitan Planning Area:

  • Provide planning, administration, and coordination in support of transit and associated public infrastructural improvements both regionally and inside the Metropolitan Planning Area.
  • Improve mobility by expanding modal choice through increased transit and alternative transportation facilities and services with an emphasis on under-served populations.
  • Integrate walkability planning into development, local, HAMPO, and regional plans.

LIBERTY TRANSIT—CURRENT PLANNING ACTIVITIES

Liberty Transit (libertytransit.org(opens in new tab)) is a fixed-route bus transit system operated in the Hinesville Urban Area and funded with a combination of local, state, and federal Section 5307 funds. HAMPO coordinates planning activities and provides technical assistance.

TRANSIT DEVELOPMENT PLAN Update: Transit agencies evaluate their Transit Development Plans (TDP) every five years as a prerequisite for the receipt of federal and state funding. The TDP update process provides transit agencies with the opportunity to define public transportation needs, solicit input from stakeholders and the public, identify capital and operational deficiencies, and define courses of action to advance the mission and goals of the transit agency.

On June 20, 2024, the Hinesville City Council adopted the Liberty Transit 2024 TDP:

On May 17, 2018, Hinesville City Council adopted the 2018 TDP:

IMPLEMENTATION OF TDP RECOMMENDATIONS

With the guidance of City Council, the short-term recommendations are on schedule to be implemented on November 1, 2018, concurrently with implementing complementary paratransit:

  • Revise the route schedule to a simpler time-point structure (the proposed new routes will all have a common headway of 75 minutes (1:15)).
  • A single route on Fort Stewart.
  • All routes stop at Liberty Regional Medical Center.
  • Minimize “loops” to improve direct service.
  • Minimize “limited” service runs.

COMPLEMENTARY PARATRANSIT SERVICES

“Paratransit is a comparable transportation service required by the ADA for individuals with disabilities who are unable to use fixed route transportation systems”

Liberty Transit has been meeting paratransit requirements by offering transit services to the severely disabled by using a deviated route system. Call in today; the bus will show tomorrow at your origin and take you to your destination. Liberty Transit is replacing the deviated route with “complementary paratransit service,” which is basically a separate but parallel system specifically for the severely disabled. This service is scheduled to start November 1, 2018.

Complementary Paratransit Service Policy:

  • Curb to curb with guidelines on assistance to those passengers who need assistance beyond the curb.
  • Feeder service from curb to fixed route bus stop if the destination is acceptable from a standard bus stop.
  • The service area will be the city limits for Walthourville, Flemington, and Hinesville, ¾ mile from the route for Allenhurst, Fort Stewart, Liberty, and Long Counties.
  • Time of service will be from the first scheduled stop to the last stop minus 30 minutes.
  • Maximum fare is two times the regular fare.
  • No premium service will be offered, such as same-day trips beyond the defined service area or trips before or after the established service hours.

REGIONAL TRANSIT PLANNING

Chatham Area Transit (CAT) has recently completed an assessment of regional transit feasibility. The study can be found below.

DRAFT POLICIES AND PROCEDURES

HAMPO Transportation Studies

Liberty Transit Transit Development Plan: Transit agencies evaluate their Transit Development Plans (TDP) every five years as a prerequisite for the receipt of federal and state funding. The TDP update process provides transit agencies with the opportunity to define public transportation needs, solicit input from stakeholders and the public, identify capital and operational deficiencies, and define courses of action to advance the mission and goals of the transit agency.

On June 20, 2024, the Hinesville City Council adopted the Liberty Transit 2024 TDP:

On May 17, 2018, Hinesville City Council adopted the Liberty Transit 2018 TDP:

Current Activities

Federal law requires that metropolitan planning organizations publish an annual list of obligated projects.

§ 450.334 Annual listing of obligated projects(opens in new tab).

(a) In metropolitan planning areas, on an annual basis, no later than 90 calendar days following the end of the program year, the State(opens in new tab), public transportation operator(s), and the MPO shall cooperatively develop a listing of projects (including investments in pedestrian walkways and bicycle transportation facilities) for which funds under 23 U.S.C.(opens in new tab) or 49 U.S.C. Chapter 53(opens in new tab) were obligated in the preceding program year.

(b) The listing shall be prepared in accordance with § 450.314((opens in new tab)a) and shall include all federally funded projects authorized or revised to increase obligations in the preceding program year and shall, at a minimum, include the TIP information under § 450.326(g)(1) and ((opens in new tab)4) and identify, for each project, the amount of federal funds requested in the TIP, the federal funding that was obligated during the preceding year, and the federal funding remaining and available for subsequent years.

(c) The listing shall be published or otherwise made available in accordance with the MPO’s public participation criteria for the TIP.

The FY 2021 HAMPO Obligated Projects are listed below:

HAMPO Safety Action Plan

On April 10, 2025, the HAMPO Policy Committee adopted the SS4A-funded Safety Action Plan. This plan was developed with the intent of creating implementation strategies to prevent roadway deaths and serious injuries. Upon completion and adoption of a Safety Action Plan, the prioritized list of projects will be eligible for funding from a variety of sources, including Implementation Grants through the Safe Streets for All (SS4A) grant program from the 2021 Bipartisan Infrastructure Law. The adopted plan, along with the signed resolution and related appendices, can be found below.

SR 196 / SR 119 / E.g., Miles Parkway Corridor Study

This corridor serves as the primary entrance for the Liberty Regional Medical Center, commercial shopping plazas, residential subdivisions, and the headquarters for the City of Hinesville Public Works Department and Liberty Transit and is located 1 mile from Fort Stewart Military Installation’s main access gate. The corridor carries between 17,000 and 21,700 AADT with numerous at-grade intersections and commercial drives, and cross sections varying between 4 lanes with unchannelized medians and 4 lanes with no median infrastructure.

The 2045 HAMPO Metropolitan Transportation Plan was adopted in October 2020 and identified this roadway as a high crash corridor, as well as an area targeted for substantial land development. Three capacity, safety, and freight-supportive operational enhancement projects were recommended by the MTP as high priorities for the MPO region. In addition, a local TSPLOST referendum was successfully passed for Liberty County in 2020 and identified this corridor as a key location for investment of 30% STIP eligible funding. Since the adoption of the MTP, GDOT District 4 performed a signal warrants analysis within this corridor and determined that operational improvements to facilitate existing AADT volumes were needed, while also recommending that a safety analysis be performed for the entire corridor. A coordination meeting was held with local and state elected officials, GDOT partners, industry experts, and local MPO leadership, where consensus was reached that a comprehensive corridor analysis is needed to understand existing and future transportation issues and how best to utilize the various public and private transportation funds available for capital improvements for the corridor. The results of this meeting were presented to the MPO Committees with unanimous support to pursue funding for a comprehensive corridor analysis.

This corridor study was presented to the Georgia Association of Metropolitan Planning Organizations (GAMPO) for funding at the March 29, 2021, meeting. This study passed unanimously and will receive $200,000 in funding to evaluate this corridor.

The study was completed in October 2022 and is available below:

Background

Road Safety Audit—State Route 196/Elma G. Miles Parkway (Live Oak Church Road to Veterans Parkway)

Based on an analysis of crash data, this 1.7-mile road segment stood out with a high crash count when compared to similar roads in our area. At the request of HAMPO, GDOT initiated and completed a road safety audit to document existing corridor conditions and make recommendations to improve safety along the corridor:

HAMPO conducts studies in order to gain a detailed and comprehensive understanding of existing or perceived transportation issues. The goals of these studies are to develop strategies and recommendations that can move the potential projects toward implementation using federal, state, and local transportation dollars. For additional information, contact Jeff Ricketson(opens in new tab).

Links to Previous Transportation Studies

Highway Planning

Traffic Counts

Transit Planning

For additional information, contact Jeff Ricketson.

All publications herein were prepared in cooperation with the Department of Transportation, Federal Highway Administration. The opinions, findings, and conclusions in these publications are those of the author(s) and not necessarily those of the Department of Transportation, State of Georgia, or the Federal Highway Administration.

SR 196 / SR 119 / E.g., Miles Parkway Corridor Study

The Hinesville Area Metropolitan Planning Organization (HAMPO) conducted a study of E.g., Miles Pkwy from Airport Road/15th Street to General Screven Way. The study area is divided into two priority areas: Area 1 from Veterans Parkway to General Screven Way and Area 2 from Airport Rd/15th St. to Veterans Pkwy.

Both study areas experience higher-than-average crash rates, especially rear-end crashes. Many corridor segments have twice the statewide average crash rate for similar roadways. Crashes in the last five years have resulted in pedestrian fatalities. A Georgia Department of Transportation (GDOT) Road Safety Audit established the need for safety improvements in 2017. For these reasons, safety improvements are a primary recommendation for the study area.

The corridor is a bus route and serves Liberty Regional Medical Center, the Public Works Office, and both commercial and residential developments.

The study’s goals were to:

· Propose projects that improve operations, safety, and quality of life

·Identify implementable solutions and funding sources

·Address access challenges

·Enhance safety for people on foot and on bicycles

·Recommend projects that represent the interests of stakeholders and the public

The final report on the E.g., Miles Corridor study is below.  Due to the large file size, the report is divided into sections.

Table of Contents(opens in new tab)
Report(opens in new tab)
Appendix A(opens in new tab): Traffic Counts
Appendix B(opens in new tab):  Synchro Analysis Results for Unsignalized Intersections
Appendix C(opens in new tab):  Synchro Analysis Results for Signalized Intersections
Appendix D(opens in new tab):  Synchro Analysis Results for Full Build Conditions
Appendix E(opens in new tab):  ICE and Signal Warrants

Appendix F(opens in new tab):  Intersection Analysis memo for Deal Street @ E.g., Miles Parkway
Appendix G(opens in new tab):  Detailed Concept Maps

Background

This corridor serves as the primary entrance for the Liberty Regional Medical Center, commercial shopping plazas, residential subdivisions, and the headquarters for the City of Hinesville Public Works Department and Liberty Transit and is located 1 mile from Fort Stewart Military Installation’s main access gate. The corridor carries between 17,000 and 21,700  annual average daily traffic (AADT) with numerous at-grade intersections and commercial drives, and cross sections varying between 4 lanes with unchannelized medians and 4 lanes with no median infrastructure.

The 2045 HAMPO Metropolitan Transportation Plan (MTP) was adopted in October 2020 and identified this roadway as a high crash corridor, as well as an area targeted for substantial land development. Three capacity, safety, and freight-supportive operational enhancement projects were recommended by the MTP as high priorities for the Metropolitan Planning Organization (MPO) region. In addition, a local TSPLOST referendum was successfully passed for Liberty County in 2020 and identified this corridor as a key location for investment of 30% STIP eligible funding. Since the adoption of the MTP, GDOT District 4 performed a signal warrants analysis within this corridor and determined that operational improvements to facilitate existing AADT volumes were needed, while also recommending that a safety analysis be performed for the entire corridor. A coordination meeting was held with local and state elected officials, GDOT partners, industry experts, and local MPO leadership, where consensus was reached that a comprehensive corridor analysis was needed to understand existing and future transportation issues and how best to utilize the various public and private transportation funds available for capital improvements for the corridor. This corridor study received $200,000 in funding from the Georgia Association of Metropolitan Planning Organizations (GAMPO).

HAMPO Bike & Pedestrian Study

The 2022 update to the HAMPO Bicycle & Pedestrian Study was completed in October 2022. The completed study and the subsequent appendices can be viewed below:

HAMPO last developed a bicycle and pedestrian plan in 2008, which can be viewed at this link here(opens in new tab).

Performance Management

In accordance with the Fixing America’s Surface Transportation Act (FAST Act), state Departments of Transportation and Metropolitan Planning Organizations must use a transportation performance management approach in carrying out their federally required transportation planning and programming activities. The process requires the establishment and use of a coordinated performance-based approach to transportation decision-making to support national goals for the federal-aid highway and public transportation programs. For more information on performance management, visit the Federal Highway Administration Website:

collaboration.fhwa.dot.gov/dot/fhwa/pm/default.aspx(opens in new tab).

HAMPO has adopted the following Performance Measures (PM) for project planning and post-project performance:

  • PM I – Safety: Are we reducing crash frequency and severity?
  • PM II – State of Good Repair: Are we maintaining our systems?
  • PM III – Congestion: Are we managing our travel times by holding or increasing our level of service?
  • PM IV – Transit Assets: Are our transit fleets and facilities maintained and replaced on a regular schedule?

The GDOT 2025 Safety Performance Measures were adopted by the HAMPO Policy Committee on December 12, 2024. The resolution is available for viewing here(opens in new tab).

The following linked document details HAMPO’s adopted performance management and associated measures, noting all the below in this single (opens in new tab)file with a table of contents.

  • System Performance Report (PM1 Safety)
  • Transportation Performance Management Targets
  • TIP and MTP—Project List with Performance Measures
  • December 12, 2024: Resolution adopting the 2025 Safety Performance Measures
  • Performance-Based Transit Planning Agreement
  • TAMP Participant Accountable Executive Approval Form
  • Appendix A: Project Types
  • Appendix B: Example MPO TIP Projects – Dalton MPO

 

RFP-RFQ: Professional Services

HAMPO Request for Proposals for Professional Consulting Services for Program Administration and Technical Assistance

The Liberty Consolidated Planning Commission is interested in contracting with a qualified consultant to administer and assist in performing technical work elements of HAMPO’s Unified Planning Work Program for fiscal year 2027 with up to two optional one-year extensions.

The preferred qualifications of the consultant, in order of priority, are previous experience with MPOs in Georgia, previous experience preparing reports required by FHWA and GDOT from MPOs, and qualifications of the project team.

The RFP can be downloaded by clicking here or is available at the Liberty Consolidated Planning Commission/HAMPO office (see address below).

Per the RFP, questions had to be submitted by 1 PM on May 19th. Only one was received:

Q:  On page 8, under Executive Summary, it says, “Present a brief summary describing the proposal and your company and its capabilities. Give the names of the person(s), address(es), telephone, and e-mail address.” Can you clarify, please? Who are you wanting to see here?

A: The name and contact information for both the authorized signer for the company and the point of contact (project manager) for the company.

RFP responses are due at the Liberty Consolidated Planning Commission/HAMPO office (100 N. Main Street, Room 2100, Hinesville, GA 31313) by 2 PM on Friday, May 29th, 2026.

HAMPO Request for Proposals for Professional Consulting Services to Prepare a Regional Freight Plan Update

The Liberty Consolidated Planning Commission is interested in contracting with a qualified consultant to prepare a Regional Freight Plan Update. The preferred qualifications of the consultant are previous experience and performance preparing regional freight plans, project understanding/approach, and demonstrated abilities of the project. The RFP can be downloaded by clicking here or is available at the Liberty Consolidated Planning Commission/HAMPO office (see address below).

RFP responses are due at the Liberty Consolidated Planning Commission/HAMPO office (100 N. Main Street, Room 2100, Hinesville, GA 31313) by 2 PM on Friday, June 12th, 2026.